Projects

Finishing the last part of installation in school in Bosnia

Finishing the last part of installation in school in Bosnia COUNTRY  |  Bosnia - Hercegovina
PLACE/ CITY  |  Boljanic
YEAR  |  2017

Finishing the last part of installation in school in Bosnia

It has been 5 years since part of this school received a heating system from our foundation. The old part of the school though is still without heating. In winter the children have to move to the newer part, which results in over-crowded classes.
After realizing many projects in Romania we think this school has to be finished. The boiler has enough capacity but has to be connected with underground pipes to the other building.

Last year in August offers were made and the total amount was between € 10.000 and € 12.000. Plans are made and the realisation will be in summer 2017. In October it has to be ready so the children do not have to worry about the coming winter.

Of course there were already a lot of improvements. It Is not as bad anymore as used to be when children had to take wood from home to school. Still a lot has to be done but with support from everyone we can realize this project!

On behalf of the Bosnian children many thanks for your support!

Tom Visser



Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia Finishing the last part of installation in school in Bosnia